365bet投注网

Email: [email protected]
Phone:: +44 20 7240 9319
back to top

Hybrid OR

365bet投注网This Project was completed in multiple-phases so that there would be as little downtime as possible to these highly critical areas of the Hospital. Altogether the renovation created new work areas, such as the Hybrid Operating Room Suite, PACU/Prep Recovery, the Core Desk, Support Spaces, the Staff Lounge, and Offices. The design aesthetic uses straight lines and curves throughout the flooring and ceiling patterns.

Completed Date:
Project Type:
Project Size:
Project Cost:
bet356游戏bet36体育在线网bet36在线官网bet36在线开户开户买球